Solar Lighting & Off-Grid Technical Guides

Practical, vendor-neutral guidance for contractors, EPC teams, consultants and procurement staff who specify solar street lighting and off-grid power. We write these from the buyer’s side of the table: what to specify, what to check, and what to ask suppliers for.

A solar street light luminaire measured on an outdoor test frame with a light meter
A luminaire measured on an outdoor test bench with a lux meter. Each guide below covers one decision you have to make before or during procurement.
An engineering site drawing and specification documents on a work table
Preparing a tender
Start with the documents that decide whether your tender attracts serious suppliers.

How to specify solar street lights in a tender →

Split-type and all-in-two solar street lights compared side by side in a yard
Choosing a product family
Both keep the panel separate, but the battery lives in a very different place.

Split vs all-in-two: which fits your project →

A LiFePO4 battery pack and an MPPT charge controller on a workshop bench
Unreliable sunshine
Most under-sized systems are sized on the best month, not the worst week.

Battery autonomy for cloudy weeks →

Two different solar street light luminaires compared side by side on a bench
Comparing quotes
Two quotes at the same price are rarely the same product.

Making supplier quotes comparable →

Browse guides by goal

Standards commonly cited in tenders

A clamp meter, lux meter, tape measure and caliper on a workshop bench

These are public standards, not claims about any particular supplier. If your specification cites them, ask every bidder for the document that proves compliance for the exact model offered — not for the product family or a generic certificate.

StandardWhat it coversWhat to ask the supplier for
IES LM-79Electrical and photometric measurement of LED luminairesA test report for the exact model offered
IES LM-80 + TM-21LED lumen maintenance testing and projected depreciationLM-80 data for the LED used and the TM-21 projection applied
ANSI/IES RP-8Recommended practice for roadway and street lightingThe lighting-class calculation behind the proposed pole spacing
IEC 61215 / IEC 61730PV module design qualification and safetyModule certificates matching the module on the datasheet
UN 38.3Lithium battery transport testingThe test summary — required by carriers for shipping
IEC 62133 / IEC 62619Lithium battery safety, portable and industrialCell and pack level certificates
IEC 60529 (IP)Ingress protection against dust and waterThe claimed IP rating and which part of the product it applies to
IEC/EN 62262 (IK)Impact resistance of enclosuresThe IK rating for the luminaire housing
IEC 61000-4-5Surge immunityThe surge rating claimed and the surge protection fitted
ISO 1461Hot-dip galvanizing of steelCoating thickness in microns and the galvanizing report
EN 40 / EN 1090Lighting columns and execution of steel structuresA pole design calculation for your local wind speed

How we can help

  • Review a specification, BOQ or tender document and flag what is under-specified or self-contradictory
  • Match a product and configuration to your site conditions, rather than upselling the largest model
  • Source from qualified manufacturers and manage quality from order to shipment
  • Carry out pre-shipment inspection and supply the documentation your tender submission needs

If you are preparing a tender, BOQ or specification and want a second opinion on product selection, contact us — we are happy to review your documents.